Sign In | Join Free | My himfr.com
Home > Led Testing Equipment >

IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control

Sinuo Testing Equipment Co. , Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers
     
    Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers
    • Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers
    • Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers
    • Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers
    • Buy cheap IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control from wholesalers

    IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control

    Ask Lasest Price
    Brand Name : Sinuo
    Model Number : SN9938A
    Certification : Calibration Certificate (Cost Additional)
    Price : Negotiable
    Payment Terms : T/T
    Supply Ability : 10 Sets Per Month
    Delivery Time : 30 Days
    • Product Details
    • Company Profile

    IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control


    IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control


    Product Information:


    The luminaires thermal aging rack is designed and produced based on IEC60598-1:2021 and the test sample’s form, material, maximum dimensions, heaviest weight and other data provided by the user. It is used to simulate the on-off aging test of street lights, while monitoring the temperature rise to determine whether there is any impact on the usage and verify its reliability.
    This equipment adopts PLC intelligent control with mature technology, an optional computer control model, equipped with a voltage-adjustable voltage regulator, each layer is independently controlled, and different samples can be tested at the same time. At the same time, it is equipped with a 64-channel temperature meter, which can monitor the sample temperature rise in real-time.


    Test principle:

    The output voltage is adjusted through the voltage regulator to provide power to the lamp samples. The PLC intelligent control system can control the opening and closing of the lamps according to the preset on-off time, and each layer is controlled independently. The touchscreen version of the temperature detector is external and monitors the temperature rise of the lamp in real time. The computer version of the temperature inspection instrument is built-in and communicates with the computer. It can form a temperature-time curve on the computer and control the power supply on and off according to the temperature rise.



    Technical Parameters:

    Input powerAC220V 50HZ, 10kW
    Electrical controlMitsubishi PLC intelligent control
    Operation interfaceComputer operation version.
    Test itemsluminaires channel aging test (with temperature monitoring function)
    Test sample

    Street lamps or similarly installed luminaires
    5-200W

    Test output power

    3 channels (one channel for each layer); 3 pcs voltage regulators of 0-300V, 3kVA. Each output has independent voltage adjustment and voltage indication; each group of outputs has working status monitoring, on/off time, and total running time indication;

    Temperature data collection

    SN1000 temperature meter
    Number of channels: 64 channels
    Sampling frequency: 1S
    Recording mode: loop recording
    Power distribution: 1 channel 24VDC power distribution
    Temperature acquisition module 1708P1 input signal: thermocouple K, E, R, B, N, T, E, J, S, WRE5-26, WRE3-25, current is 4-20mA, 0-10mA, 0-20mA or voltage is 0 -5V,0-10V,1-5V.

    Test cycle0-999999 times, can be preset
    Power on time0-99h59min59s can be preset
    Power off time0-99h59min59s can be preset
    Sample mounting fixtureStreet lamp pole sleeve, one for each workstation
    Sample connection terminalSpring-loaded quick-connect terminals, one per workstation
    ProtectionEmergency stop, leakage, short circuit, overload, and other safety protection
    Dimensions and weightWDH=2200*1700*1500mm, weight about 300kg
    Accessories

    Thermocouple: Omega K type TT-30, one roll, about 300 meters
    Terminals: 30 pcs

    Precautions and maintenance

    1 Please don’t touch terminal posts and samples with hands during power-on test process to prevent electric leakage.
    2 Test installation or removal must be carried out in the state of power failure.
    3 The device should be dustproof and moisture-proof.


    Quality IEC 60598-1 Luminaires Thermal Testing Aging Rack For Road Lamp Test Computer Control for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Sinuo Testing Equipment Co. , Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)